[1]
Azahar, N.F. , Raja Muhammad Rooshdi, R.R. , Ismail, N.A.A. , Marhani, M.A. , Sahamir, S.R. , Wan Azahar, W.N.A. and Yunus, R.M. 2025. Determinant of Escalating Construction Material Costs in the Post-Pandemic Period: Contractor’s Perspective. Built Environment Journal. 22, SI (Jun. 2025). DOI:https://doi.org/10.24191/bej.v22iSI.6484.