[1]
M. S. B. . Samsi, M. F. . Zainuddin, F. M. . Yop Zain, M. T. . Saidin, M. E. . Mamat, and Z. . Zainal Abidin, “THE READINESS AND CHALLENGES IN THE INDUSTRIALISED BUILDING SYSTEM (IBS) ADOPTION IN SARAWAK FROM G7 CONTRACTORS’ PERSPECTIVE”, MySE, vol. 11, no. 1, pp. 45–60, Mar. 2024.