1.
Samsi MSB, Zainuddin MF, Yop Zain FM, Saidin MT, Mamat ME, Zainal Abidin Z. THE READINESS AND CHALLENGES IN THE INDUSTRIALISED BUILDING SYSTEM (IBS) ADOPTION IN SARAWAK FROM G7 CONTRACTORS’ PERSPECTIVE. MySE [Internet]. 2024 Mar. 14 [cited 2024 Nov. 22];11(1):45-60. Available from: https://journal.uitm.edu.my/ojs/index.php/MySE/article/view/985