APPLICATION AND DESIGN OF PRODUCTION ROOM LAYOUT WITH 5S – ARC METHOD TO REDUCE WASTE (CASE STUDY ON RUBBER INDUSTRY PRODUCTION)

Authors

  • Aldilo Dwi Rashindra Trisakti Institute of Transportation and Logistics Jakarta IPN Kebon Nanas Street No.2, Cipinang Besar Sel., Jatinegara District, East Jakarta City, Special Capital Region of Jakarta 13410
  • Ghiyats Septio Zulkarnaen Trisakti Institute of Transportation and Logistics Jakarta IPN Kebon Nanas Street No.2, Cipinang Besar Sel., Jatinegara District, East Jakarta City, Special Capital Region of Jakarta 13410
  • Yosi Pahala Trisakti Institute of Transportation and Logistics Jakarta IPN Kebon Nanas Street No.2, Cipinang Besar Sel., Jatinegara District, East Jakarta City, Special Capital Region of Jakarta 13410
  • Deslida Saidah Trisakti Institute of Transportation and Logistics Jakarta IPN Kebon Nanas Street No.2, Cipinang Besar Sel., Jatinegara District, East Jakarta City, Special Capital Region of Jakarta 13410

DOI:

https://doi.org/10.24191/mjoc.v8i1.20479

Keywords:

Industrial Production, Production Layout, Relation Chart

Abstract

This study aims to get good production facility layout recommendations to reduce material handling distance in the company. This is intended so that the production process can run optimally. This study examined the rubber processing industry located in Bogor patent where the production process in this industry still uses simple methods. This causes a significant amount of waste in the production system in the industry. Therefore, this study discussed the redesign of the production room layout by using ARC proximity (Activity Relation Chart), which is a method to see the level of intimacy between activities in the production process. It also examines the work culture in industrial production using the 5S method. The results of this study show that there is a reduction in the distance and time of movement of goods in the production process with 2 alternative layout proposals contained in this scientific research.

References

Blais, C., St-Pierre, J., & Bergeron, H. (2023). Performance measurement in new product development projects: findings from successful small and medium enterprises. International Journal of Project Management, 41(2), 102451.

Candrianto, C., & Ningsih, R. (2021). Analisis Lingkungan Kerja Menggunakan Metode 5s Pada Gudang Jasa Logistik (Studi Kasus Pt. Dli Indonesia). In Prosiding Seminar Nasional Manajemen Industri dan Rantai Pasok (Vol. 2, No. 1, pp. 21-36).

Sukmana, E. (2022). Analisis Penerapan Metode 5R Pada Area Kerja Gudang Fashion Di Toserba Yogya Sunda Bandung (Doctoral dissertation, STIE Ekuitas).

Karadkar, U., Audenaert, N., Mikeal, A., Phillips, S., Maslov, A., Mallen, E., ... & Nordt, M. (2007). Relationship Mapping for Art Education and Research. Digital Humanities, 107.

Noerpratomo, A. (2018). Pengaruh Persediaan Bahan Baku Dan Proses Produksi Terhadap Kualitas Produk Di CV. Banyu Biru Connection. Jurnal Manajemen Dan Bisnis (Almana) 2(2):20–30.

Malim, M. R., Abd Rahman, S. S., & Abdul Halim, F. (2019). Optimising traffic flow at a signalised intersection using simulation. Malaysian Journal of Computing (MJoC), 4(2), 261-269.

Mohd Nordin, N.A, Shariff, S. S.R. , Omar, M., & Supadi, S. S.(2022). Optimizing order picker problem using dynamic programming method. International Journal of Nonlinear Analysis and Applications, 13(1), 1985-1998.

Nurcahyo, R., Apriliani, F., Muslim, E., & Wibowo, A. D. (2019). The analysis of the implementation of 5-S principles integrated with ISO 9001 requirements at higher education level. Sage Open, 9(3), 2158244019870773.

Rostika, T. (2022). Analisis Penerapan Metode 5R Pada Area Kerja Gudang Di Pt. Pindad Enjiniring Indonesia (Doctoral dissertation, STIE Ekuitas).

Shariff, S. S. R., Nordin, N. A. M., Omar, M., & Supadi, S. S. (2022). Modelling the InnerWarehouse Shortest Route Planning using Dynamic Programming Block. Environment-Behaviour Proceedings Journal, 7(SI9), 611-617.

Sofyan, M. S. & Cahyana, A. S. (2017). RelayoutGudang Barang Jadi Untuk Memaksimalkan Kapasitas Produk Jadi Dengan Menggunakan Metode, Activity Relation Chart dan Shared Storage. 185–97.

Tahir, S., Syukriah dan Sayed Baidhawi. (2015). Usulan Perbaikan Tata Letak Fasilitas Dengan Menggunakan Algoritma CRAFT. Malikussaleh Industrial Engineering Journal 4(2), 36–41.

Utari, P. W., Hasibuan, Y. M., & Nasution, R. H (2020). Perancangan Ulang Tata Letak Fasilitas Dengan Menggunakan Metode Konvensional Berbasis 5S. JiTEKH, 8(2), 85-91.

Vinodh, S., Kumar, S. V., & Vimal, K. E. K. (2014). Implementing lean sigma in an Indian rotary switches manufacturing organisation. Production Planning & Control, 25(4), 288-302.

Wahyudi, S., Achmad, T., & Pamungkas, I. D. (2022). Prevention Village Fund Fraud in Indonesia: Moral Sensitivity as a Moderating Variable. Economies, 10(1), 26.

Downloads

Published

2023-04-10

How to Cite

Rashindra, A. D. ., Zulkarnaen, . G. S. ., Pahala, Y. ., & Saidah, D. (2023). APPLICATION AND DESIGN OF PRODUCTION ROOM LAYOUT WITH 5S – ARC METHOD TO REDUCE WASTE (CASE STUDY ON RUBBER INDUSTRY PRODUCTION). Malaysian Journal of Computing, 8(1), 1414–1426. https://doi.org/10.24191/mjoc.v8i1.20479