The Significance of Facilities Management Aspect in Developing Maintenance Management Plans during Pre- Development Stages of Educational Private Finance Initiative (PFI) Projects
DOI:
https://doi.org/10.24191/bej.v21i2.975Keywords:
Facilities management, private finance initiative, partial least square, structural equation modellingAbstract
Facilities Management (FM) is one of the essential aspects that needs to be considered in the building maintenance management plan. Generally, the scope of FM involves thorough and effective administration, finance, operation and maintenance of the building. In the context of the Private Finance Initiative (PFI) projects, the operation and maintenance stage is longer compared to the design and construction stages. Therefore, the focus during this stage should be emphasised proactively. This research aims to determine the significance of FM aspect towards maintenance management plan of PFI projects during pre-development stages. This research used previous literature, mainly from journals articles to construct the models and formulate the literature reviews. Additionally, a quantitative approach was employed as the research methodology. A questionnaire survey was distributed to the maintenance personnel involved in the PFI projects in Malaysia. The survey was conducted towards the educational PFI projects only. This research also used Partial Least Square-Structural Equation Modelling (PLS-SEM) software to perform data analysis. There are two constructs in this research which are the FM aspects and maintenance management plan. The measurement and structural models were developed to determine the significance of the FM aspect towards the maintenance management plans. There are five indicators that represents FM aspects and six indicators of maintenance management plan highlighted in this research. All these indicators are proven to be reliable and valid through the internal consistency, convergent validity, cross loading value. The Fornell Lacker Criterion was conducted to prove discriminant validity between FM aspect and maintenance management plan. The findings of this research found that the FM aspects are very significant towards the maintenance management plan of the PFI project during the predevelopment stages. It was proven through structural model analysis using p and t-value. This research can be beneficial for better implementation of maintenance management.
References
Ab Hamid, M., Sami, W., & Mohmad Sidek, M. (2017). Discriminant Validity Assessment: Use of Fornell & Larcker Criterion Versus HTMT Criterion. Journal of Physics: Conference Series 890 012163. https://doi:10.1088/1742-6596/890/1/012163
Ali, A., Kamaruzzaman, S., Sulaiman, R., & Peng, Y. (2010). Factors Affecting Housing Maintenance Cost In Malaysia. Journal of Facilities Management, 8(4), 285-298. https://doi.org/10.1108/14725961011078990
Alshawi, M. (2009). Concept and Background to Public Private Partnership (PPP)/ Private Finance Initiative (PFI) UK Experience. Iraq Institute for Economic Reform.
Baldwin, E. (2003). The Private Finance Initiative - What Opportunities for Facilities Management? Journal Of Facilities Management, 2(1), 54-67. https://doi.org/10.1108/14725960410808113
Cohen, J. (1988). Statistical Power Analysis For The Behavioural Sciences. Lawrence Erlbaum Asscociates.
El- Haram, M., & Agapiou, A. (2002). The Role of The Facility Manager in New Procurement Routes. Journal of Quality in Maintenance Engineering, 8(2), 124-134. https://doi.org/10.1108/13552510210429983
Enoma, A (2005) The role of facilities management at the design stage. In: Khosrowshahi, F (Ed.), 21st. Annual ARCOM Conference, 421-121. Association of Researchers in Construction Management. https://www.arcom.ac.uk/-docs/proceedings/ar2005-0421-0430_Enoma.pdf
Fauzi, M. A. (2022). Partial Least Square Structural Equation Modelling (PLS-SEM) in Knowledge Management Studies: Knowledge Sharing in Virtual Communities. Knowledge Management & E- Learning, 14(1), 103-124. https://doi.org/10.34105/j.kmel.2022.14.007
Garis Panduan PPP. (2009). Garis Panduan Kerjasama Awam Swasta. https://www.ukas.gov.my/my/mypartnership/ppp/garis-panduan
Hair, J., Black, W., Babin, B., & Anderson, R. E. (2010). Multivariate Data Analysis. Pearson Prentice Hall
Hair, J., Hollingsworth, C., Randolph, A., & Chong, L. A. (2017). An Updated and Expanded Assessment of PLS-SEM in Information System Research. Industrial Management & Data Systems, 117(3), 442- 458. https://doi.org/10.1108/IMDS-04-2016-0130
Hair, J., Risher, J., Sarstedt, M., & Ringle, C. (2019). When to Use and How to Report The Results of PLS- SEM. European Business Review, 31(1), 2-24.https://doi.org/10.1108/EBR-11-2018-0203
Hashim, H., Sapri, M., & Ab Azis, S. (2019). Strategic Facilities Management Functions for Public Private Partnership (PPP) Healthcare Services in Malaysia. Journal of the Malaysian Institute of Planners, 17(1), 35-47. https://doi.org/10.21837/pm.v17i9.584
Hashim, H., Sapri, M., & Low, S.-T. (2016). Public Private Partnership (PPP) Facilities Management for Healthcare Services in Malaysia. Journal of Facilities Management, 14(4), 350-362. https://doi.org/10.1108/JFM-02-2016-0005
International Organization for Standardization. (2024). Facility Management - Vocabulary (ISO 41011:2024 (en)). https://www.iso.org/obp/ui#iso:std:iso:41011:ed-2:v1:en:sec:3.5.6
Ismail, K., Abdul Talib, Y., Salleh, N., & Japri, A. (2018). Critical Success Factors in Operation Phase of Private Finance Initiative (PFI) Projects. International Journal of Academic Research in Business & Social Sciences, 8(1), 877-886. http://doi.org/10.6007/IJARBSS/v8-i1/3894
Ismail, K., Khaderi, S., Syed Abdul Karim, S., Abdul Talib, Y., & Salleh, N. (2019). An Analysis of Sustainability Implementation in Malaysian Private Finance Initiative (PFI) Projects: Issues, Challenges and Way Forward. International Journal Supply Chain Management, 8(3), 665- 670. https://doi.org/10.59160/ijscm.v8i3.3320
Ismail, S. (2011). A systematic Review of Research on Private Finance Initiative (PFI) and Public Private Partnership (PPP). International Journal of Economics, Management & Accounting, 19(3), 33-60. https://doi.org/10.31436/ijema.v19i3.199
Khaderi, S., & Abd Shukor, A. (2016). Innovative Implementatin of Private Finance Initiative (PFI) Procurement: Challenges and Key Issues in Pre-Construction Stage. Environment-Behaviour Proceedings Journal, 1(3), 71-78. https://doi.org/10.21834/e-bpj.v1i3.350
Khaderi, S., Abd Aziz, A., & Abd Shukor, A. (2018). A Framework Structure To Enhance The Implementation of Private Finance Initiative (PFI) Projects in Malaysia at Pre Construction Stage: A Methodological Development. Built Environment Journal, 15(1), 23-32. https://ir.uitm.edu.my/id/eprint/30002
Khalid, E. I., Abdullah, S., Hanafi, M., Said, S., & Hasim, M. (2019). The Consideration of Building Maintenance at Design Stage in Public Building. Facilities, 37(13/14), 942-960. https://doi.org/10.1108/F-04-2018-0055
Kipli, K., Abdullah, F., & Mustafa, F. (2016). The Missing Point of Knowledge Management in PFI Projects. MATEC Web of Conference. The 4th International Building Control Conference 2016 (pp. 1-11). EDP Sciences. https://doi.org/10.1051/matecconf/20166600025
Lam, P., & Javed, A. (2015). Comparative Study On The Use of Output Specification for Australian and UK PPP/PFI Projects. Journal Performance Construction Facilities, 29(2), 1-15. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000554
Laporan Ketua Audit Negara. (2019). Siri 1, Aktiviti Kementrian/Jabatan Kerajaan dan Badan Badan Berkanun Persekutuan. Malaysia: Jabatan Audit Negara Malaysia. https://www.audit.gov.my/index.php/component/content/article/81-laporan-ketua-audit-negara/873- lkan-aktiviti-kementerian-2019-siri1
Lop, N., Ismail, K., Mohd Isa, H., & Khalil, N. (2017). Factors Affecting the Operational Performance of Public Private Partnership (PPP) Projects: Cases in Malaysia. International Journal of Academic Research in Business and Social Sciences, 7(11), 1394-1409. http://dx.doi.org/10.6007/IJARBSS/v7- i11/3578
Martinez, S., & Walton, C. (2015). The Efficiency Claim of Public-Private Partnerships: A Look into Project Operations and Maintenance Costs. In A. Zhanmin Zhang, Cesar Queiroz, & C. Michael Walton (Eds.), Advances in Public-Private Partnerships, 2nd International Conference on Public Private Partnerships (pp. 225-239). American Society of Civil Engineers. https://ascelibrary.org/doi/10.1061/9780784480267.018
Mohd Rahim, F., Abd Rahim, M., Zainon, N., Chuing, L., & Abd Samad, Z. (2018). Project Life Cycle Risk of Public Private Partnership (PPP) Projects for Construction Sustainability. Journal of Design and Built Environment, Special Issue (1), 39-53. https://doi.org/10.22452/jdbe.sp2018no1.4
Musawa, M., Ismail, S., & Ahmad, H. (2017). Disclosure of Public Private Partnership (PPP) Voluntary Information. Asia Pacific Journal of Business Administration, 9(2), 146-163. https://doi.org/10.1108/APJBA-10-2016-0095
Osei-Kyei, R., & Chan, P. (2017). A Best Practice Framework for Public Private Partnership Implementation for Construction Projects in Developing Countries : A Case of Ghana. Benchmarking: An International Journal, 25(8), 2806-2827. https://doi.org/10.1108/BIJ-05-2017-0105
Oyelede, L. (2013). Avoiding Peformance Failure Payment Deductions in PFI/PPP Projects: Model of Critical Success Factors. Journal Performace Constructed Facilities, 27(3), 283-294. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000367
Pitt, M., Cannavina, D., Sulaiman, R., Mahyuddin, N., & Wu, C. (2016). Hotel Maintenance Management In Sanya, China. Journal of Facilities Management, 14(4), 304-314. https://doi.org/10.1108/JFM-12- 2015-0034
Public Private Infrastructure Advisory Facility (2016). Policy Paper on Infrastructure. Implementing Facilities Management Service Through PPPs. https://www.ppiaf.org/documents/5157
Ramayah, T., Cheah, J., Chuah, F., Ting, H., & Memon, M. (2018). Partial Least Squares Structural Equation Modelling (PLS-SEM), An Updated and Practical Guide to Statistical Analysis. Pearson.
Robinson, H., & Scott, J. (2009). Service Delivery and Performance Monitoring in PFI/PPP Projects. Construction Management and Economics, 27(2), 181-197. https://doi.org/10.1080/01446190802614163
Roper, K. (2017). Facility Management Maturity and Research. Journal of Facilities Management, 15(3), 235-243. https://doi.org/10.1108/JFM-04-2016-0011
Rybnicek, R., Plakolm, J., & Baumgartner, L. (2020). Risks in Public–Private Partnerships: A Systematic Literature Review of Risk Factors, Their Impact and Risk Mitigation Strategies. Public Performance & Management Review, 43(5), 1174-1208. https://doi.org/10.1080/15309576.2020.1741406
Yong, C. P., Ali, A. S., Ahmad, F., & Chua, S. J. (2017). Influences Of Key Stakeholders’ Involvement In Maintenance. Journal of Property Management, 35(2), 217-231. https://doi.org/10.1108/PM-01-2016-0004
Downloads
Published
Versions
- 06-08-2024 (2)
- 01-07-2024 (1)
How to Cite
Issue
Section
License
Copyright (c) 2024 Muhammad Haziq Md Anuar, Mohd Zahid Mohd Salleh, Nurshahafiqah Asli, Syahrul Nizam Kamaruzzaman
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
CC BY-NC-ND 4.0 DEED
Attribution-NonCommercial-NoDerivs 4.0 International