A Review of Current Issues in Industrialised Building System (IBS) for Construction Projects

Authors

  • Mohd Reeza Yusof College of Built Environment, Universiti Teknologi MARA, 40450 Shah Alam, Selangor, Malaysia
  • Izatul Laili Jabar College of Built Environment, Universiti Teknologi MARA, 40450 Shah Alam, Selangor, Malaysia
  • Abdul Hadi Nawawi College of Built Environment, Universiti Teknologi MARA, 40450 Shah Alam, Selangor, Malaysia
  • Mohd Nasrun Mohd Nawi School of Management of Technology and Logistics, Universiti Utara Malaysia, 06010 Sintok, Kedah, Malaysia

DOI:

https://doi.org/10.24191/bej.v21i1.503

Keywords:

Industrialised Building System, Integration, IBS current issues, IBS challenges

Abstract

In Malaysia, the concept of prefabrication is known as Industrialised Building System (IBS). In terms of cost, time, productivity, and quality, IBS is certainly beneficial based on previous local and international research. As part of Construction Industry Development Board (CIDB), CIDB's Construction 4.0 Strategic Plan 2020-2025, the Malaysian construction industry is being urged to employ innovative construction techniques. These initiatives illustrate the Malaysian government's commitment to addressing the IBS agenda. Even though numerous things have been done to enhance the IBS adoption in Malaysia, various issues have arisen to bring about delays, disputes, miscommunications, and payment issues affecting the IBS players. Thus, the primary purpose of this research is to identify current issues and assist policymakers and IBS players in mitigating those issues. The literature review was the first phase of the research, with the secondary data derived from relevant books, journals, articles, theses, dissertations, conference proceedings and reports. The second phase involved the collection of primary data, wherein the information was collected through a preliminary study. The research findings showed that IBS construction still faces challenges and issues when adopted by the industry, where four (4) out of five (5) interviewees stated that the primary integration issues are teamwork or collaboration and procurement. This paper aims to present a literature review and preliminary survey findings related to establishing pertinent integration issues and challenges.

References

Abdullah, N. M. Q. B., Lee, Y. Y., Lee, Y. H., Gui, H. C., & Whyte, A. (2021). Perception Analysis of Industrialized Building System (IBS) Implementation for G7 Contractors in Kuching, Sarawak. ASM Science Journal, 14, 1–7. https://doi.org/10.32802/asmscj.2020.641

Alawag, A. M. M., Alaloul, W. S., Liew, M. S., Al-Bared, M. A. M., Zawawi, N. A. W. A., & Ammad, S. (2021). The Implementation of the Industrialized Building System in the Malaysian Construction Industry—a Comprehensive Review. In Lecture Notes in Mechanical Engineering (Issue May). Springer Singapore. https://doi.org/10.1007/978-981-16-0742-4_1

Construction Industry Development Board. (2021). IBS Adoption on Government and Private Projects in Malaysia 2019. Retrieved from https://www.cidb.gov.my/wp-content/uploads/2022/07/212-IBS-Adoption-on-government-private-projects-2019-min.pdf

Construction Industry Development Board. (2003). IBS Road Map 2003-2010. Retrieved from https://repository.pam.org.my/bitstream/123456789/111/1/IBS%20Roadmap.pdf

Construction Industry Development Board. (2007). Construction Industry Master Plan 2006-2015 (CIMP 2006-2015). Retrieved from http://lib.kkr.gov.my/cgi-bin/koha/opac-detail.pl?biblionumber=3235&shelfbrowse_itemnumber=5016

Construction Industry Development Board. (2015). Construction Industry Transformation Programme 2016-2020. Construction Industry Development Board (CIDB). Retrieved from https://www.cream.my/data/cms/files/1_%20184%20Handbook%20BIM(1).pdf

Construction Industry Development Board. (2018). Construction Industry Review & Prospect 2018/2019. In Construction Industry Development Board (CIDB). Construction Industry Development Board (CIDB). Retrieved from https://www.cidb.gov.my/wp-content/uploads/2022/11/CIDB-Annual-Report-2018_compressed.pdf

Construction Industry Development Board. (2021). Construction 4.0 Strategic Plan (2021-2025). In Construction Industry Development Board (CIDB). Construction Industry Development Board (CIDB). Retrieved from https://smart.cidb.gov.my/article/construction-40-strategic-plan-2021-2025-a-decisive-maneuver-to-embrace-the-industry-revolution-40-6#:~:text=The%20Construction%204.0%20Strategic%20Plan%20(2021%2D2025)%20is%20designed,Framework%20and%20the%20Digital%20Economy

Department of Statistics Malaysia. (2021). Keluaran Dalam Negeri Kasar, 2015-2020. Retrieved from https://open.dosm.gov.my/ms-MY/dashboard/gdp

Halil, F. M., Mohammad, M. F., Mahbub, R., & Rahim, A. F. A. (2015). Sustainable Value Through the Implementation of Strategic Partnering in Industrialised Building System (IBS). International Symposium in Developing Economies: Commonalities Among Diversities, October, 188–200. Retrieved from https://www.irbnet.de/daten/iconda/CIB18128.pdf

Hu, X., & Chong, H. Y. (2020). Integrated Frameworks of Construction Procurement Systems for Off-Site Manufacturing Projects: Social Network Analysis. International Journal of Construction Management, 0(0), 1–9. https://doi.org/10.1080/15623599.2020.1766188

Jaffar, Y., & Lee, C. K. (2020). Factors Influencing Industrialised Building System (IBS) Project Performance: A Systematic Review. Journal of Governance and Integrity, 3(2), 64–81. https://doi.org/10.15282/jgi.3.2.2020.5311

Khalil, F. D. A. A., Abd Aziz, F. N. A., Hassim, S., & Jaafar, M. S. (2016). A Review on Industrialised Building System Issues in Malaysia. MATEC Web of Conferences, 47, 0–3. https://doi.org/10.1051/matecconf/20164704019

Ariffin, H. L. B. T., Lynn, B. Y. H., Shukery, N. B. M., Rahiman, N. B. A., Bin Mahmud, S. H., & Raslim, F. M. (2018). Innovative Procurement Adoption for Industrialised Building System (IBS) Projects. International Journal of Engineering & Technology, 7, 887–892. https://doi.org/10.14419/ijet.v7i2.29.14277

Ministry of Works. (2022). National Construction Policy 2030. Retrieved from https://www.cidb.gov.my/eng/national-construction-policy-ncp-2030/

Musa, M. F., Mohammad, M. F., Yusof, M. R., & Ahmad, R. (2016). Industrialised Building System Modular System (IBSMS) Organisational Readiness Framework. Procedia - Social and Behavioral Sciences, 222, 83–92. https://doi.org/10.1016/j.sbspro.2016.05.191

Nawi, M. N. M., Osman, W. N., & Che-Ani, A. I. (2014). Key Factors for Integrated Project Team Delivery: A Proposed Study in IBS Malaysian Construction Projects. Advances in Environmental Biology, 8(5), 1868–1872. Retrieved from https://www.researchgate.net/publication/265376628_Key_Factors_for_Integrated_Project_Team_Delivery_A_Proposed_Study_in_IBS_Malaysian_Construction_Projects

Nawi, M. N. M., Lee, A., Kamar, K. A. M., & Hamid, Z. A. (2011). A Critical Literature Review on The Concept of Team Integration in Industrialised Building System (IBS) Project. Malaysian Construction Research Journal, 9(2), 1–17. Retrieved from https://www.researchgate.net/publication/272624002_A_critical_literature_review_on_the_concept_of_team_integration_in_industrialised_building_System_IBS_project

Osman, W. N., Nawi, M. N. M., Zulhumadi, F., Shafie, M. W. M., & Ibrahim, F. A. (2017). Individual Readiness of Construction Stakeholders to Implement Integrated Project Delivery (IPD). Journal of Engineering Science and Technology, 12 (Special Issue 2), 229–238. Retrieved from https://www.researchgate.net/publication/320110709_Individual_readiness_of_construction_stakeholders_to_implement_integrated_project_delivery_IPD

Rahim, A. A., & Qureshi, S. L. (2018). A Review of IBS Implementation in Malaysia and Singapore. Journal of the Malaysian Institute of Planners, 16(2), 323–333. https://doi.org/10.21837/pm.v16i6.486

Rahim, S. A. A., Hashim, M. A. S., & Shen, W. S. (2020). A Potential Study of Automation System in Industrialised Building System (IBS) in Enhancing Malaysian Construction Industry's Performance. INTI JOURNAL, 2020(14). https://openurl.ebsco.com/EPDB%3Agcd%3A16%3A1776992/detailv2?sid=ebsco%3Aplink%3Ascholar&id=ebsco%3Agcd%3A156605919&crl=c

Saad, S., Alaloul, W. S., Ammad, S., Altaf, M., & Qureshi, A. H. (2022). Identification of Critical Success Factors for The Adoption of Industrialized Building System (IBS) in the Malaysian construction industry. Ain Shams Engineering Journal, 13(2), 101547. https://doi.org/10.1016/j.asej.2021.06.031

Shukor, A. S. A., Mohammad, M. F., Mahbub, R., & Ismail, F. (2011). Supply Chain Integration Challenges In Project Procurement in Malaysia: The Perspective of IBS Manufacturers. Association of Researchers in Construction Management, ARCOM 2011 - Proceedings of the 27th Annual Conference, 1 (January), pp. 495–504. Retrieved from http://www.arcom.ac.uk/-docs/proceedings/ar2011-0495-0504_AbdShukor_Mohammad_Mahbub_Ismail.pdf

Tajul Ariffin, H. L., Mohd, N. I., Mustaffa, N. E., Bandi, S., & Mei Chee, C. H. (2019). Perspectives on Issues and The Application of The Innovative Procurement Approaches for The Industrialised Building System (IBS). International Journal of Built Environment and Sustainability, 6(1), 39–43. https://doi.org/10.11113/ijbes.v6.n1.328

Thomas Tarang, V. A., Mohammad, M. F., Nizam Akbar, A. R., & Mohamed, M. R. (2022). Pertinent Internal and External Issues in Industrialised Building System (IBS) Construction Business in Malaysia. Built Environment Journal, 19(1), 32. https://doi.org/10.24191/bej.v19i1.15990

Viana, M. L., Hadikusumo, B. H. W., Mohammad, M. Z., & Kahvandi, Z. (2020). Integrated Project Delivery (IPD): An Updated Review and Analysis Case Study. Journal of Engineering, Project, and Production Management, 10(2), 147–161. https://doi.org/10.2478/jeppm-2020-0017

Zairul, M. (2022). Opening the Pandora's Box of Issues in The Industrialised Building System (IBS) in Malaysia: A Thematic Review. Journal of Applied Science and Engineering (Taiwan), 25(2), 297–310. https://doi.org/10.6180/jase.202204_25(2).0006

Zuber, S. Z. S., Nawi, N. M., & Nifa, F. A. A. (2019). Zuber, S. Z. S., Nawi, N. M., & Nifa, F. A. A. (2019). Construction Procurement Practice: A Review Study of Integrated Project Delivery (IPD) in the Malaysian Construction Projects. International Journal of Supply Chain Management, 8(1), 777–783. Construct. International Journal of Supply Chain Management, 8(1), 777–783. Retrieved from https://www.researchgate.net/publication/332604437_Construction_Procurement_Practice_A_Review_Study_of_Integrated_Project_Delivery_IPD_in_the_Malaysian_Construction_Projects#fullTextFileContent

Downloads

Published

01-01-2024

How to Cite

Yusof, M. R., Jabar, I. L., Nawawi, A. H., & Mohd Nawi, M. N. (2024). A Review of Current Issues in Industrialised Building System (IBS) for Construction Projects. Built Environment Journal, 21(1), 109–117. https://doi.org/10.24191/bej.v21i1.503