Improving the Effectiveness of Risk Management Among Sub-Contractors in the Northern State of Malaysia

Authors

  • Nurqameela Md Radzi Universiti Teknologi MARA, Perak Branch, Seri Iskandar Campus, 32610 Seri Iskandar, Perak, MALAYSIA
  • Kartina Alauddin Universiti Teknologi MARA, Perak Branch, Seri Iskandar Campus, 32610 Seri Iskandar, Perak, MALAYSIA
  • Mohmad Mohd Derus Universiti Teknologi MARA, Perak Branch, Seri Iskandar Campus, 32610 Seri Iskandar, Perak, MALAYSIA

Keywords:

Risk management, Sub-Contractors, Strategies, Effectiveness, Construction

Abstract

The risk should be managed crucially by any level of multidiscipline. Construction activities involved hazardous situations and unpredictable incidents during construction. There is a central issue triggered by subcontractors’ tasks, i.e., failure to manage the risk management of main contractors effectively. Many factors contributed to the ineffectiveness of risk management implementation among sub-contractors, including lack of skills and expertise, lack of experience, and communication breakdown with the team. Therefore, this paper significantly provides the results of a survey of sub-contractors involved in the Northern construction projects. The goal of this study concerns the strategies to improve the effectiveness of sub-contractors in managing the risk on site. These are described with the results of the questionnaire survey analysis from 300 respondents. The respondents are from sub-contractors among G1 to G4 in the northern state of East Malaysia. Using the KruskalWallis test, sixteen strategies were identified from the literature have been tested among the sub-contractors. The finding reveals that only ten approaches, i.e., effective site management and supervision, experience contractors, good feasibility studies, project understanding, thoroughly investigate vendor capabilities, frequent progress meetings, systematic coordination between parties, allocation enough resources, the right path, and proper identification of risk does give significant strategies to improve implementation of risk management among sub-contractors in the northern states of Malaysia.

References

Abdul-Rahman H., Al-Tmeemy S.M.H., Harun Z., Ye M., & Kho (2012). The major causes of quality failures in the Malaysian building construction industry Retrieved 26 March 2018, from http://www.fte.edu.iq/upload/upfile/ar/122212.pdf

Aiyewalehinmi, E.O. (2013). Factor Analysis of Job Satisfaction in the Construction Industry, IOSR Journal of Engineering, 3(7), 16-2

Buys, F., (2015). Five causes of Project Delay and Cost Overrun, and Their Mitigation Measures. [online] Available at: <https://www.linkedin.com/pulse/five-causes-project-delay-cost-overrun-mitigation-measures-buys. Accessed 1st November 2018

Divya, R. and Ramya, S., (2015). Causes, Effects and Minimization of Delays in Construction Project. National Conference on Research Advance in Communication, Computation, Electrical Science and Structures. Pp:47-53. [online] Available at: Accessed 11th November 2018

Health and Safety Authority. (2018). Hsa.ie. Retrieved 2 May 2018, from http://www.hsa.ie/eng/Topics/Hazards/McCaig, C 2010, 'Research and Evaluation Design', in L Dahlberg and C McCaig (eds), Practical Research and Evaluation, SAGE Publications, Inc, Great Britain, pp. 29-40

Kluwer, W. (2016). The Importance of Supervision on Construction Sites. (online) Available at: https://app.croneri.co.uk/export/print/618241?product=26 Accessed 11th November 2018

Lagiman, S. (2017). Improvement of Relationship Between Main Contractor And Subcontractor For Successful Construction Project Implementation, Unpublished Thesis, Degree of Master of Science in Construction Technology Management, Faculty of Technology Management and Business, Universiti Tun Hussein Onn Malaysia

Luceno, V., Gerber, S., Dager, J., Finkle, L., & Scott Gerber. (2018). Seven steps to successful project planning. Retrieved August 26, 2021, from https://articles.bplans.com/seven-steps-to-successful-project-planning/

Marzouk, M. M., El Kherbawy, A. A., & Khalifa, M. (2013). Factors influencing sub-contractor selection in construction projects. Hbrc Journal, 9(2), 150-158

McCaig, C (2010). Research and Evaluation Design', in L Dahlberg and C McCaig (eds), Practical Research and Evaluation, SAGE Publications, Inc, Great Britain, pp. 29-40

Mochai, T. (2009). Ten best practices for successful project management. [online] Available at: http://www.techrepublic.com/blog/10-things/10-best-practices-for-successful-project-management/ Accessed 15th November 2018

Mwanzoni, (2015). Key components of good feasibility study. (online) Available at: http://mwanzoni.com/key components-of-a-good-feasibility study/ Accessed 12th November 2020

Naveed, F., & Khan, K. I. A. (2021). Investigating the influence of information complexity on construction quality: a system’s thinking approach. Engineering, Construction and Architectural Management

Nguyen P. T & Nguyen P.C (2020), A Case Study in Design-Build: Risk Management in Engineering and Construction: A Case Study in Design-Build Projects in Vietnam, Engineering, Technology & Applied Science Research Vol. 10, No. 1, 2020, 5237-5241 5237

Phan, V. T. (2020). Contractor's attitude towards risk and risk management in construction in two western provinces of Vietnam. Engineering, Technology & Applied Science Research, 10(6), 6418-6421

Project Academy - Abolore, A. A. (2012). Comparative study of environmental sustainability in building construction in Nigeria and Malaysia. Journal of Emerging Trends in Economics and Management Sciences, 3(6), 951-961

Singh Nitya P. (2020), Managing environmental uncertainty for improved firm financial performance: the moderating role of supply chain risk management practices on managerial decision making, International Journal of Logistics Research and Applications, A Leading Journal of Supply Chain Management, Volume 23, 2020 - Issue 3

Teartisup, S. (2007). Appropriate Construction Technology for Residence in Chao Phraya River Estuary: A case study of Sakla Village. Nakhara: Journal of Environmental Design and Planning, 2, 97-108

Yuan, T., Xiang, P., Li, H., & Zhang, L. (2020). Identification of the main risks for international rail construction projects based on the effects of cost-estimating risks. Journal of Cleaner Production, 274, 122904

Viswanathan, B. (2012). 6 Ways to Prevent Cost Overruns (online) Available at:<https://project-management.com/6-ways-to-prevent-cost-overruns/> Accessed 15th October 2019

Watt, A. (2014). Project Management. BC Open Textbooks (online) Available at: <http://opentextbc.ca/projectmanagement/chapter/chapeter-11-resource-planning-project-management> Accessed 15th October 2019

Yap, E. H. (2013). Causes of abandoned construction projects in Malaysia (Doctoral dissertation, UTAR)

Yoke-Lian, L., Hassim, S., Muniandy, R., & Teik-Hua, L. (2012). Review of subcontracting practice in construction industry. International Journal of Engineering and Technology, 4(4), 442.

Downloads

Published

16-07-2025

How to Cite

Improving the Effectiveness of Risk Management Among Sub-Contractors in the Northern State of Malaysia. (2025). Built Environment Journal, 19(1). https://journal.uitm.edu.my/ojs/index.php/BEJ/article/view/7556

Similar Articles

1-10 of 143

You may also start an advanced similarity search for this article.